Draw-tite 24892 SPORTFRAME HITCH Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Für das Auto Draw-tite 24892 SPORTFRAME HITCH herunter. Draw-Tite 24892 SPORTFRAME HITCH User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 3
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Installation Instructions
Nissan Juke
Front Wheel Drive
Part Numbers:
Hitch Shown In Proper Position
Wiring Access Location:
Equipment Required: Pull wires (provided) ,
lubricant or soapy water.
Wrenches: 3/4
Drill Bits: 1/2
3/4”
Bridge
Do Not Exceed Lower of Towing Vehicle
Manufacturer’s Rating or
Drawbar must be used in the
RISE position only.
Drawbar Kit:
3593
Fastener Kit: 24892F
24892
60311
77280
2000 LB (908 Kg) Max Gross Trailer Weight
200 LB (90.8 Kg) Max Tongue Weight
1
11
1
1
11
1
2
22
2
6
66
6
2
22
2
3
33
3
4
44
4
3
33
34
44
4
5
55
5
Tie down
bracket
Tie down
hook
Tie down
bracket
1.00
3/8”
Frame rail
Access hole
Remove rubber isolator
at this location
Frame rail
Fascia
Tie down
hook
Accessory Rating
B
Note: sort hardware prior to hitch installation to confirm bolt lengths are installed in proper locations.
1. Lower exhaust by removing rubber isolators from muffler hangers. Spraying a lubricant or soapy water on the metal hanger rod and the
rubber isolator helps removal.
2. Enlarge access hole to allow for block and carriage bolt use ½” drill bits (See Figure 2.) or use a die grinder to enlarge the access hole in
bottom of frame rail. See Figure 2. Paint any bare metal.
3. Feed pull wires with spacer and bolt (item 5 & 6) into frame rail thru enlarge access hole and out the attachment holes. Leave pull wires
attached.
4. Raise hitch into position with bridge over tailpipe and tie down bracket over tie down hook. Feed pull wires thru holes on hitch bracket and
continue to pull fasteners through frame rail and adjacent holes in brackets. Carefully remove pull wires and attach conical washers and nut
finger tight only (Be careful not to push fastener back into frame rail).
5. Install ½-13 x 2.50 carriage bolt into tie down bracket slot, thru tie down hook and attach spacer, conical washer and nut finger tight only.
6. Reinstall muffler .
7. Torque all fasteners to specifications shown below.
8. Paint any exposed metal.
© 2012 Cequent Performance Products, Inc
Sheet 1 of 3 24892N 8-14-12 Rev. A
1
11
1
Qty. (1) Carriage bolt ½-13 X 2.50 GR5
4
44
4
Qty. (3) Hex nut ½-13
2
22
2
Qty. (1) Spacer ¼‘” X 1.50 X 3.00
5
55
5
Qty. (2) Carriage bolt ½-13 X 1.75 GR 5
3
33
3
Qty. (3) Conical washer
6
66
6
Qty. (2) Spacers ¼” X 1.00 X 3.00
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
Form F206 Rev A 5605
Tighten all ½-13 GR 5 fasteners with torque wrench to 75 Lb.-Ft. (102 N*M)
Access hole modification to allow
for block and carriage bolt.
3
33
3
4
44
4
bracket
Figure 1.
Figure 2.
Seitenansicht 0
1 2 3

Inhaltsverzeichnis

Seite 1 - Installation Instructions

Installation InstructionsNissan Juke Front Wheel DrivePart Numbers:Hitch Shown In Proper PositionWiring Access

Seite 2 - Instructions d’installation

Instructions d’installationNissan Juke Front Wheel DriveNuméros de pièce :Attelage montré dans la position appropriéePoints d'accès au câblage :É

Seite 3 - Instrucciones de instalación

Instrucciones de instalaciónNissan Juke Tracción delanteraNúmeros de partes:El enganche se muestra en la posic

Kommentare zu diesen Handbüchern

Keine Kommentare